Post-earthquake reconstruction project, promoted by the Protezione Civile, created with load-bearing structure in prefabricated panels of plywood and ecological materials. The easy assembly of the panels, together with innovative building-site management, permitted creation of the six buildings comprising the project in only 78 days.

PROJECT: 6 green/antisismic buildings (180 flats)
WORK CARRIED OUT: Concept, design architectural and structural, M&E planning

BUILD UP AREA: 8800 mq

DATA AND LOCATION: 2010, L’Aquila, Abruzzo, Italy

PROJECT FASE: Completed